Qa وظائف في United Arab Emirates
إنشاء تنبيه وظيفي لهذا البحث
Qa • United Arab Emirates
آخر تحديث: 6 منذ أيام
Design, develop, execute and maintain comprehensive test plans and test cases based on strong understanding of the products .
Perform functional, regression, performance, and user acceptance te...أظهر المزيدآخر تحديث: منذ أكثر من 30 يومًا
Mechanical Inspection Engineer
PenspenAbu Dhabi, UAE Mechanical Inspection Engineer.We are hiring a highly experienced.The ideal candidate will be responsible for overseeing contracts, executions, and compliance across multiple disciplines in line wi...أظهر المزيدآخر تحديث: منذ أكثر من 30 يومًا
Senior QA Engineer
FlatgigsAEQuick Apply
QA - PSS Domain
IBS SofwareUnited Arab Emirates Essential background in the airline industry, with a mid-level understanding of airline Passenger Service Systems (PSS) and Reservation flows.
Demonstrated experience working as a team and individua...أظهر المزيدآخر تحديث: 6 منذ أيام
عرض العمل هذا غير متوفر في بلدك.
Mechanical Inspection Engineer
PenspenAbu Dhabi, UAEمنذ أكثر من 30 يومًا
الوصف الوظيفيBachelor's degree in engineering Minimum 10 years’ experience in Oil & Gas, industrial and structural. Familiarity with UAE regulations and authority procedures is highly preferred. Excellent communication, reporting, and coordination skills. Previous UAE / GCC experience is mandatory.
Mechanical Inspection Engineer
We are hiring a highly experienced Mechanical Inspection Engineer with a background in Oil & Gas, industry. The ideal candidate will be responsible for overseeing contracts, executions, and compliance across multiple disciplines in line with UAE regulations.
The duty of the Inspection Engineer shall include but not be limited to the following tasks :
- Make sure that any activity offered for his inspection has an approved shop drawing, method statement (MS), Quality Control Procedure (QCP) and Inspection & Test Plan (ITP).
- Carry out all planned site inspections as per the intervention points marked in the relevant ITP.
- All site inspection shall be carried out vide an official Inspection and Test request (ITR) submitted by the CONTRACTOR through the proper channels.
- Inspection status shall be recorded in the ITR and any relevant check sheet as per the approved QCP. Any outstanding items shall be verified prior to closing the ITR. In the event that CONTRACTOR excludes an item from an ITR, the item will be dealt with / inspected utilising the ITR from which the item was excluded.
- Verify with Independent Testing Laboratory (ITL) that all relevant test results related to specific ITR meets the project requirements.
- In the event he notices that the relevant Shop Drawing, materials used, MS, QCP and ITP do not cover all specification requirements, he should report the same in writing to the Construction Manager and the Senior Discipline Engineer. Copy of such report shall be forwarded to COMPANY project manager.
- Closely monitor site activities to ensure quality of WORK is in compliance with CONTRACT requirements, good construction practice, only approved materials are used, compliance with shop drawings, and report to Senior Structural Engineer / Construction Manager.
- Make sure that all materials used comply with the approved Material Approval Request (MAR).
- Make sure that the CONTRACTOR’s personnel are using the latest edition of the approved shop drawings, MS, QCP and ITP as per the project master index
- Closely monitor concrete pours and check continuously concrete materials delivered to site, ensure compliance with QA / QC procedures, and ensure all concrete tests are carried out as per CONTRACT requirements.
- Frequently check formwork / shuttering systems and ensure quality, safety and constructability aspects are met.
- Make sure that any non-conformity has been reported through a Non Conformance Report (NCR), reviewed by his line supervisor. (Construction supervisor / Construction Manager as applicable). All NCRs shall be coordinated with the PMT Senior Quality Assurance Engineer.
- Advise Planning Engineer and Construction Manager of any slippage of Progress regarding site activities.
- Participate with PMC disciplines in reviewing the Closeout Report as submitted by Contractor.
- Review the relevant As-Built drawings as submitted by CONTRACTOR and make sure that all site conditions are properly addressed.
Requirements :
#LI-JM1